Since the earliest days of Alabama's territorial period, there had been a perceived need for a navigable link to connect the gap between the Tennessee River, which flows east to west through northern Alabama, and the Tombigbee River, which flows south through Alabama, eventually emptying into the Gulf of Mexico. The Tennessee River swings west toward Mississippi and comes within 500 miles of the Gulf of Mexico before turning north to travel several hundred miles to the Ohio River. Prior to the creation of the Tenn-Tom, commercial river traffic heading to the Gulf of Mexico had to travel hundreds of miles out of the way, despite its proximity to the Gulf.
In 1874, during the administration of Pres. Ulysses S. Grant, the federal government conducted a study to determine the feasibility of constructing such a waterway. The study determined that although construction of a waterway was feasible, lack of sufficient commercial traffic made it impractical. In 1913, the federal government again studied the possibility of constructing a waterway consisting of 65 dams and lift locks, but the U.S. Congress failed to appropriate funds for construction, and later studies failed to sway lawmakers.

Organized support from powerful southern congressmen, including Alabama senator John Sparkman and Mississippi senator John C. Stennis, overcame the opposition. Even after approval, actual construction of the waterway did not commence until 1972, after being further delayed by lawsuits over the environmental impacts of the project. Construction proceeded over the next 12 years, consisting of 10 locks and dams and 234 miles of navigable waterway and the excavation of 310 million cubic yards of earth, more than was excavated for the Panama Canal. Eight railroad bridges and 14 highway bridges were either relocated or rebuilt. The single-greatest challenge was the construction and excavation of the so-called Divide Cut. This 29-mile portion of the waterway connected the Tenn-Tom with Pickwick Lake, which forms the border between Alabama and Mississippi in the northwestern corner of the state. The cut is 280 feet wide and at its deepest required the removal of earth to a depth of 175 feet. This single section of the waterway alone took eight years and required the removal of 150 million cubic yards of earth, almost half of the total excavated for the entire project. The Tenn-Tom encompasses 17 public ports and terminals, 110,000 acres of land, and another 88,000 acres managed by state conservation agencies for wildlife habitat preservation and recreational use. The elevation change between the two ends of the waterway is 341 feet, or a drop of 1.46 feet per mile.

Today, the two primary commodities shipped via the Tenn-Tom are coal and timber products, together comprising about 70 percent of total commercial shipping on the waterway. Prior to its construction, however, the Corps of Engineers predicted that the waterway would float 27 million tons in its first year of operation. As the result of a variety of fluctuating economic conditions including low demand for coal and loss of overseas markets grain, however, the Tenn-Tom has peaked at only about 8 million tons per year thus far.
Additional Resources
Brose, David S. Yesterday's River: The Archeology of Ten Thousand Years Along the Tennessee-Tombigbee Waterway. Cleveland, Ohio: Cleveland Museum of Natural History, 1991.
Additional Resources
Brose, David S. Yesterday's River: The Archeology of Ten Thousand Years Along the Tennessee-Tombigbee Waterway. Cleveland, Ohio: Cleveland Museum of Natural History, 1991.
Stine, Jeffrey K. Mixing the Waters: Environment, Politics, and the Building of the Tennessee-Tombigbee Waterway. Akron, Ohio: University of Akron Press, 1993.